Rilin

Decide scope changes from design and cost options

Connect the proposed instruction, revised design, quantities, rates and schedule options with contract authority. The owner can issue or reject a formal change-of-scope order with its engineer’s review, limiting unapproved cost exposure.

A proposed change affects an approved product, process, contract or operating plan.

People in the process

  • OOwner PMO & EngineerProcess Owner
  • EEngineeringParticipating Team
  • CCommercialParticipating Team
  • AAuthority’s EngineerParticipating Team

Records it works with

  • Change request and current approved baseline
  • Affected agreements, policies and operating records
  • Technical, commercial and regulatory assessments

The process is a starting point.The standards are yours.

Configure for the project, concession, contract and jurisdiction. Central and state energy requirements differ. Audit cadence and measurement authority come from the actual project framework.