Notify and substantiate EPC claims for delay and variation

Connect each delaying event or change instruction to the site diary, contractual notice, time impact analysis and cost build-up in a single claim file. Contracts can preserve entitlement to extension of time and cost and track each claim through determination, negotiation or arbitration.

Starts when

A delaying event, hindrance, change instruction or employer default occurs on a contract package.

Runs: Per event; several times a month on a live EPC project.

The process is a starting point. The standards are yours.

Configure for the project, concession, contract and jurisdiction. Central and state energy requirements differ. Audit cadence and measurement authority come from the actual project framework.