Connect each delaying event or change instruction to the site diary, contractual notice, time impact analysis and cost build-up in a single claim file. Contracts can preserve entitlement to extension of time and cost and track each claim through determination, negotiation or arbitration.
Starts when
A delaying event, hindrance, change instruction or employer default occurs on a contract package.
Runs: Per event; several times a month on a live EPC project.
Configure for the project, concession, contract and jurisdiction. Central and state energy requirements differ. Audit cadence and measurement authority come from the actual project framework.