Bring test results, open defects, safety work and contractor submissions to the appointed engineer’s completion review. The owner sees which works need rectification while the engineer retains the professional certification decision.
An inspection, incident, assessed signal or proposed operating change requires action.
People in the process
Records it works with
Configure for the project, concession, contract and jurisdiction. Central and state energy requirements differ. Audit cadence and measurement authority come from the actual project framework.