Rilin

Keep factory permissions current as work changes

Check changes in capacity, use and workforce against site-specific permissions and conditions.

A proposed site change affects capacity, layout, process, workforce or material storage.

People in the process

  • EEHSProcess Owner
  • PPlant OperationsParticipating Team
  • LLegalParticipating Team

Records it works with

  • Current site permissions and their conditions
  • Proposed capacity, layout, load and workforce changes
  • Reviewed site-specific factory, labour, environmental and safety requirements

The process is a starting point.The standards are yours.

Configure for the actual site, process, workforce and materials. Applicable labour and factory rules, pollution consents, waste, chemical, electrical and fire requirements depend on the activity and jurisdiction. MSE cases require an eligibility and forum check.