Issue and cancel permits-to-work for line and substation shutdowns

Tie each shutdown request to load despatch clearance, the hazard briefing, recorded isolation and earthing points and the returned permit. Operations can restore supply only once every person and material is clear, while Safety reports any accident to the Electrical Inspector.

Starts when

A request for shutdown or work on, or near, an electric line, substation or plant apparatus.

Runs: Daily, per shutdown or work job.

The process is a starting point. The standards are yours.

Configure for the project, concession, contract and jurisdiction. Central and state energy requirements differ. Audit cadence and measurement authority come from the actual project framework.