Turn approved changes into controlled drawings

Trace a client instruction or engineering change through calculations, BOQ impact, revised drawings and transmittals. Commercial and site receive the approved basis for work while the design lead retains technical sign-off.

A proposed change affects an approved product, process, contract or operating plan.

People in the process

  • EEngineering & Document ControlProcess Owner
  • CCommercialParticipating Team
  • SSiteParticipating Team
  • DDocument ControlParticipating Team

Records it works with

  • Change request and current approved baseline
  • Affected agreements, policies and operating records
  • Technical, commercial and regulatory assessments

The process is a starting point.The standards are yours.

Configure for the project, concession, contract and jurisdiction. Central and state energy requirements differ. Audit cadence and measurement authority come from the actual project framework.